individual plant, Ascea (Salerno), Italy
Operator: Chirico Benedetto Comissioned: 2012 | Installed capacity: 250 kWel System agriKomp:We don’t have to invent plant concepts, we have them. Plant outputs from 100
Operator: Chirico Benedetto Comissioned: 2012 | Installed capacity: 250 kWel System agriKomp:We don’t have to invent plant concepts, we have them. Plant outputs from 100
Operator: GTG Biogas, Gebrüder Donnelly Comissioned: 2013 | installed capacity: 500 kWel Special feature: Erste agriKomp-Anlage in Nordirland. It is located there on an old
Operator: Bioenergie Rube GbR, Hans und Steffen Rube Comissioned: 2013 | Installed capacity: 290 kWel Since April 2014, part of the waste heat from the
Operator: Blum-Biogas GmbH & Co. KG | Comissioned: 2010Extensions: 2012 | Installed capacity: 500 kWel Portrait:The local heating network belonging to the plant was planned
Operator: Bioenergie Biwok e.G. | Commissioned: 2010Installed capacity: 1.760 kWel Special Feature: Two places work for a common bioenergy project and join together to form
Operator: RTOUR ENERGY a.s | Comissioned: 2012 Extensions: 2021 | Installed capacity: 1.250 kWel Portrait: The Dětenice biogas plant uses the complete thermal energy potential
Operator: Dirk Delfs | Comissioned: 2011 | Installed capacity: 150 kWel Portrait: Dairy farm with 270 dairy cows plus offspring, single-stage system without corn silage.